Services
Your location:Home - Services - Inspection Service - Detail
With the continuous increase in the installed capacity of renewable energy generation, the stability characteristics of power systems have undergone profound changes. Large-scale grid simulation must account for the external characteristics of renewable energy power stations, while strengthening the simulation modeling and security/stability calculations for renewable energy grid integration.
Simulation modeling for renewable energy grid integration can be categorized into electromechanical transient modeling and electromagnetic transient modeling depending on the application scenario; it can also be classified into device-level simulation modeling and station-level simulation modeling based on the modeling object. Simulation modeling for renewable energy integration primarily involves wind, solar, energy storage, and dynamic reactive power compensation devices. Typical testing items include fault ride-through capability simulation verification, voltage and frequency adaptability validation, and broadband oscillation risk assessment.
◆ Wind farms, photovoltaic power stations, energy storage power stations;
◆ Wind turbine converters, photovoltaic inverters, energy storage converters, dynamic reactive power compensation devices.
Station-Level Simulation Modeling
Electromechanical transient modeling and electromagnetic transient modeling for wind farms, photovoltaic power stations, and energy storage power stations.
Device-Level Simulation Modeling
Electromechanical transient modeling and electromagnetic transient modeling for wind turbines, photovoltaic inverters, energy storage converters, and dynamic reactive power compensation devices.
● Wind power
NB/T 31066-2015 Guideline for electrical simulation models of wind turbines
NB/T 31053-2021 Code of practice for electrical simulation model validation of wind turbines
NB/T 31075-2016 Specifications for electrical simulation models and validation of wind farm
● Photovoltaic
GB/T 32826-2016 Guide for modeling photovoltaic power system
GB/T 32892-2016 Model and parameter test regulation for photovoltaic power system
● Energy storage
GB/T 42716-2023 Guide for modeling of electrochemical energy storage power station
DL/T 2246.8-2021 Technical specification for grid-connected operation and control of electrochemical energy storage station—Part 8: Simulation models
DL/T 2246.9-2021 Technical specification for grid-connected operation and control of electrochemical energy storage station—Part 9: Modeling and testing
GB/T 44117-2024 Code of practice for model parameters testing of electrochemical energy storage station
Contact
Ming Chen
Telephone
0374-3212775/3212185
chenming@ketop.cn
页面版权所有:许昌开普检测研究院股份有限公司 豫ICP备15015526号-1 豫公网安备 41100202000037号